E24082 - T3-Xcel-TI

GENERAL INFORMATION:

Address: 3500 Blake St. Denver, CO 80205

The present work schedule is Monday through Friday.

Start Time: 6:00 AM
Break: 8:30 AM - 8:40 AM
Lunch: 10:30 AM - 11:00 AM
Break: 1:00 PM - 1:10 PM
Quitting Time: 2:30 PM

Start Times are in your assigned work area.

Quitting Times are leaving your work area. No one picks up more than 10 minutes before Quitting time and EVERYONE helps everyone else.

Remember: We are a TEAM!

GENERAL INFORMATION:


Job Address: 3500 Blake St. Denver, CO 80205


The present work schedule is Monday through Friday.


Start Time: 6:00 AM

Break: 8:30 AM - 8:40 AM

Lunch: 10:30 AM - 11:00 AM

Break: 1:00 PM - 1:10 PM

Quitting Time: 2:30 PM


  • Start Times are in your assigned work area.

  • Quitting Times are leaving your work area.

  • No one picks up more than 10 minutes before Quitting time and EVERYONE helps everyone else.


Remember: We are a TEAM!



Contact Info:


Project Superintendent: Sergio Berumen P: 720-586-0059


Project Manager: Victor Perez P: 303-345-3572


Project Coordinator: Ally Nelson P:  303-952-1124


Director of Education and LP: Ted Smith P: 303-550-5292


Safety Superintendent: Todd Kreps P: 720-948-7842

 

The emergency telephone number is 911.


SAFETY COMES FIRST - Report any unsafe condition to your supervisor. We will adhere to all company and safety policies, also OSHA standards in temporary electric and general safety requirements.

 

  • Report ALL injuries to your FOREMAN or project Supervisor immediately.

  • Housekeeping /clean-up will be required by all employees on a daily basis.

  •  Safety glasses, hard hats and warning vests are to be worn at all times on the jobsite.

  •  100% natural fiber clothing is recommended, and sleeves must go to at least the elbow.



ALL SAFETY POLICIES ARE ENFORCED ON THIS SITE.

 

  • SDS information is available at online at www.elightinformation.com/safety-data-sheets

  • Safety Glasses and hard hats (Type II Class E) are to be worn at all times on the jobsite.

  • PLEASE NOTE ALL EMPLOYEES MUST HAVE THEIR DRUG SCREEN CHAIN OF CUSTODY IN ORDER TO ENTER THE SITE FOR ORIENTATION.

  • Jobsite orientation is 7:30 AM on the first day, employees are expected to be there at least 15 minutes early and employees are expected to report to the superintendent.



NO HOT WORK.

 

  • Keep personal tools on site or in gang boxes at your own risk. 

  • All tools need to be returned to carrying cases. 

  • Gang boxes need to be kept closed and unused tools put away.

  • Call jobsite at 303-345-3572 if sick or late prior to start work time.

  • Safety meetings are at office trailer on Wednesday mornings.




SOME INSTALLATION PARTICULARS:


  1. All room thermostats/sensors/controllers shall be installed at 42" to center above fixed floor for ADA compliance for new installations. For replacement of existing devices, leave sufficient rolled coil of wire above the ceiling should the device need to be moved down to meet this requirement in the future.

2. All sensor or thermostat pulls that are new require 1 extra conductor to be pulled as well for future use. The shield/drain is not suitable for a conductor.

3. All panel keys will be collected daily and removed from the panels installed.

These keys are going to be given to the Westover Corporation Site Supervisor. 

4. All thermowells shall be filled with heat conductive compound that is provided.

5. Wiring Terminations designated as "X" or "XX" indicate information was unavailable at time of submittal. Please inform Westover Corporations before making field terminations.

6. Remote control devices, not in local panels, shall be accessible for adjustment and service - below 7' above fixed floor whenever possible or as shown on the provided Construction Prints.

7. Only Prints marked Construction are to be used during installation. If the prints are not marked Construction, the installer will correct any discrepancies between prints used and Construction Prints.

8. All new BAS controller panels shall have a dedicated 120VAC power source. This source shall be located and marked in the controls panel as well as on the control prints returned to Westover Corporation for Record Prints.

9. Installer responsible for maintaining existing safeties into new BAS control - electrically or pneumatically connected.

10. See Division 23 09 00 for any additional information on installation standards.









All work will only be done once and must look clean.       



It is understood that any inappropriate action (i.e., whistling, cat calling, etc.), is grounds for immediate dismissal from the project for its duration.

 

No member of the Contractor or Subcontractor’s personnel is allowed to communicate with any member of any type of media about this project. All requests for response to the media are to be directed to the Contractor’s Project Manager or Superintendent, who will elevate the request to the General Contractor.


The use of and posting to social media on or about the project is prohibited.


If you have any questions, or you are not sure about something, stop and ask. Mistakes cost money and waste time.


THINK SAFE & WORK SAFE!



Record Documents:

 

During construction, the contractor shall maintain the job site a set of updated construction documents for the singular purpose of recording changes as the job progresses. 


All record drawings shall be completed in erasable pencil, these changes shall be updated weekly.


Revisions to the Contract Documents shall be legible and shall be prepared using the following color scheme:


  • Red shall indicate new items, deviations, and routing.

  • Green shall indicate items removed or deleted. Do not use white-out.

  • Blue shall be used for relevant notes and descriptions.

 

Your foreman will provide you with the following: tools, materials, layout and a safe work environment. If you feel you are missing any of these items, see foreman personally.



ALL ENERGIZED WORK MUST BE DONE BY QUALIFIED PERSONNEL AFTER RECEIVING WRITTEN APPROVAL FROM ALL OF THE FOLLOWING: 

  • Construction Manager

  • Project Manager

  • Department Director

  • Director of Education and Loss Prevention